Rustom

Initial Operational Capability (IOC) : 2018
First Flight : November 16, 2016
Total Production : ?

Model Status Year Produced
Rustom-2 Under Development 2018 ?



Rustom-2

Group : Surveillance & Reconnaissance Airplanes
Status : Under Development
Also Known As : Rustom-H (former designation), Rustom-I
Origin : India
Initial Operational Capability (IOC) : 2018
First Flight : November 16, 2016
Total Production : ?

The Rustom is a Medium-Altitude, Long-Endurance (MALE) Unmanned Aerial Vehicle (UAV) developed by the Indian Aeronautical Development Establishment (ADE) to meet the requirements of the Indian Air Force, Navy and Army. This UAV will operate at ranges of over 300 km carrying a payload of 200 kg with an endurance in excess of 24 hours. Other sources suggest that the flight endurange is 12-15 hours (Rustom-I). Rustom will carry out Intelligence, Surveillance, Target Acquisition and Reconnaissance (ISTAR) missions. Besides, it will serve as communications relay aircraft. The first prototype is expected to get airborne by 2012. In March 2012, the program was re-named Rustom-2 with the first flight scheduled for February 2014.

Operators
Country Status State Notes
IndiaPlanned ?
Specifications
Notes
Crew 0
Mass
Max Takeoff Weight 800 kilogram
Payload 200 kilogram
Performance
Ceiling 22,000 foot
Radius of Operation 300 kilometer
Speed
Top Speed at High Altitude 150 knot
Time
Flight Endurance 15 hour

News

Sunday, 25 February, 2018
India Successfully Tests Rustom 2 Unmanned Air Vehicle

DRDO successfully flew its Rustom 2 today at its Aeronautical Test Range(ATR) at Chalakere at Chitradurga.

Wednesday, 20 December, 2017
India to Buy 22 MQ-9B Sea Guardian Unmanned Aircraft

India is purchasing 22 Predator "B" drones from the US in order to fulfill an urgent demand from the navy.

Wednesday, 5 April, 2017
Indian Air Force to Take Delivery of First Armed Heron TP Unmanned Aerial Vehicle

An announcement that India will receive its first armed Heron drones from Israel has come as Narendra Modi prepares to make history as the first Indian prime minister to

Wednesday, 16 November, 2016
India Conducts Successful First Flight of Rustom 2 MALE Unmanned Aircraft

Heralding a new era in the indigenous development of Unmanned Aerial Vehicle (UAV), DRDO today successfully carried out the maiden flight of TAPAS 201 (RUSTOM – II), a Medium

Tuesday, 8 May, 2012
Rustom-I MALE UAV Performs New Testing Flight

Indigenously designed and developed RUSTOM-1 made 14th successful flight this morning at Kolar with attainment of about 11,500 ft AGL (above ground level) and speed of above

Monday, 26 March, 2012
Rustom-2 MALE UAV to Perform its Maiden Flight in 2014

Defence Research and Development Organisation (DRDO) has taken up a project for design and development of Medium Altitude Long Endurance (MALE) Unmanned Aerial Vehicle (UAV) - Rustom-2.

Friday, 11 November, 2011
DRDO Conducts 5th Successful Flight of UAV Rustom-1

Indigenously designed and developed RUSTOM-1 made 5th successful Flight this morning while flying at an altitude of 2300 ft AGL (above ground level) & at a speed 100 Knots

Thursday, 12 February, 2009
Nishant UAV to Be Handed Over to Indian Army Soon

The country’s premier agency in the aviation sector, Aeronautical Development Establishment (ADE) will be handing over NISHANT, it’s first indigenously made Unmanned Aerial

Notes

* Prime Contractor
State Latest Known holdings/Original Procurement
Com - Date of Commissioning
Decom - Date of Decommissioning

An unhandled error has occurred. Reload 🗙

Copyright © 2003-2025 deagel.com website. All rights reserved.